Kāko‘o

The page is for the Consulting Parties to the Programmatic Agreement Among the U.S. Department of Transportation Federal Transit Administration, The Hawaii State Historic Preservation Office, The U.S. Navy, and the Advisory Council on Historic Preservation Regarding the Honolulu High-Capacity Transit Corridor Project in the City and County of Honolulu, HI (PA). The PA can be found on the HART website here.

The HART website can be found at www.honolulutransit.org

Most documents of interest to the Consulting Parties can be found on the HART Planning page

Recitals

Documents for Stipulation I: Roles and Responsibilities 

Documents for Stipulation II: Traditional Cultural Properties

Documents for Stipulation III

Documents for Stipulation IV: Design Standards

A. The City shall develop standards for, and maintain and update the Project's Design Language Pattern Book for use in all Project elements. The pattern book shall be available electronically. 

2008 - Final Design Language Pattern Book

For stations within the boundary of or directly adjacent to an eligible or listed historic property, the City shall comply with The Secretary of the Interior's Standards for the Treatment of Historic Properties, 36 C.F.R. pt 68, and will make every reasonable effort to avoid adverse effects on historic properties. If the FTA, the City and the Kako‘o find that the standards cannot be applied, the City shall consult with the consulting parties to develop a treatment plan to minimize and mitigate adverse effects on the historic property. 

B. The City shall conduct a minimum of two neighborhood design workshops for the stations in each of the Project phases. The City shall notify all consulting parties of the workshops and consider any comments received when completing station design. 

VARIOUS - Design Standards

C. At the earliest practicable time during preliminary engineering, prior to Project entry into final design, the City shall provided preliminary engineering design plans for components of the Project. 

VARIOUS - Preliminary Designs 

Documents for Stipulation V

Documents for Stipulation VI

Documents for Stipulation VII

Documents for Stipulation VIII

Documents for Stipulation IX

Documents for Stipulation X

Documents for Stipulation XI

Documents for Stipulation XII

Documents for Stipulation XIII

Documents for Stipulation XIV: Administrative Provisions

B. Project Modifications - Should the Project alignment be changed in any way that FTA determines results in a change to the APE, the City shall update the PAE maps, and FTA and the City, in consultation with other consulting parties, shall ensure that the requirements of this PA are met, after further consultation and assessment of effects, with regard to the new portions of the APE. 

2019 - ITS APE Amendment Documents

© 2019 by Honua Consulting

All rights reserved

4348 Waialae Ave., #254

Honolulu, HI 96816

Tel: 1-808-392-1617

Fax: 1-888-392-4941

Follow us at:

  • white_H
  • Facebook Social Icon
  • Twitter Social Icon
  • LinkedIn Social Icon